• First Ship - Kota Nabil (11.05.2014)
• First Feeder Service Commenced MV ALLCARGO SUSHILA (28.08.2014)
• Fully Equipped Operations commenced on (01.04.2018)
• First Main Line Service (CHINA-INDIA 2 SERVICE C-12) Introduced by WAN HAI & IAL on 10th December 2018
• Increase of Maximum Permissible Draft to 14.2m declared by VOCPA on (31.12.2018)
• Achieved 1 Million TEUs on (21.06.2019)
• Highest Monthly Throughput 64,569 TEUs achieved during August 2019
• Highest Throughput Volume handled in a calendar year : 639,618 TEUs
• Achieved 2 Million TEUs on 12th March 2021
• Berthed Longest Container Vessel MV. MSC PETRA with Max LOA of 299.95m at DBGT / VOC Port Authority on 21.04.2022
• Achieved 3 Million TEUs on 17th November 2022
• DBGT Container Terminal Wins Prestigious Award at Global India Maritime Submit 2023 for leading ESG-Initiatives.